Dept. of Civil Engg. is planning for a educational trip to sri ram sagar dam(on 7th September) for IV th B.tech students.all students who are interested to come to the trip give your names to G. Srinivas sir by Monday 11am without fail.
Saturday, August 31, 2013
Tuesday, August 20, 2013
ASSIGNMENT FOR GIS & RS (LAST DATE FOR SUBMISSION-23/08/2013)
1) Write down the length of the following regions of electromagnetic spectrum ?
a) Visible b) Infrared c) Refracted IR band d) Thermal IR
2) a) List out any eight elements of visual image interpretation ?
b) Write detailed notes on
i) Geo stationary satellites
ii) Sem synchronous satellites
3) What do mean by parallax? Illustrate the nature on over lapping vertical
photographs taken over varied terrain?
4) Define photogrametry? Write about the evaluation of photogrametry and
importance of photogrametry in real world phenomenon?
Monday, August 19, 2013
III/IV B.Tech GTE - I Assignment No. 1
MAHATMA GANDHI INSTITUTE OF TECHNOLOGY
Gandipet, Hyderabad 500 075
DEPARTMENT OF CIVIL ENGINEERING
Geotechnical Engineering – I
Assignment – I
Date of Issue: 19th
Aug, 2013
Last Date for Submission: 26st
Aug, 2013
Answer any Five
Questions with 5,6 & 7 as compulsory
|
1.
|
Derive
the following relations from fundamentals.
(a)
e in terms of w,G & S
(b) Expression for bulk unit
weight
(c) e in terms of n
|
|
2.
|
Describe
the Pycnometer method of determination of water content and for what type of
soils you recommend this method.
|
|
3.
|
Write
a brief note the following clay minerals.
(a) Montmorillite (b) Illite (c)
Kaolinite
|
|
4.
|
(a) Why do the clay particles possess a
charge on them?
(b) Write a brief note on Electric Double
layer.
|
|
5.
|
A
partially saturated soil sample has a natural moisture content of 15% and
bulk unit weight of 1.9gm/cc. The specific gravity of soil solids is 2.7.
Determine the degree of saturation, and void ratio. What will be unit weight
of soil sample on saturation.
|
|
6.
|
Determine
the unit weights of soil in the loosest and densest states of 2mm dia sphere
which have a specific gravity of 2.7.
|
|
7.
|
A
soil has a bulk unit weight of 18kN/m3 and a water content of 5%.
Calculate the amount of water in litres required to be added to 1m3
of soil to raise the water content to 15%. Assume the void ratio to be same.
Take Gs = 2.6
|
|
8.
|
Explain the method
of finding the coefficient of permeability by constant head permeability
test. Discuss the factors influencing the Permeability of soils.
|
|
9.
|
Explain
the procedure involved in classification of soil as per Indian Soil
Classification system.
|
|
10.
|
Write
a note on
(a) Terzaghi’s Effective
Stress Principle.
(b) Quick Sand
(c) Downward Seepage and
Hydrostatic Condition in soils.
|
V.Venkat Ramayya, Faculty of CIVIL
Sunday, August 18, 2013
3/4 CT ASSIGNMENT (Last Date of Submission - 24-08-2013)
1. Define
workability of fresh concrete. Explain the factors affecting workability of
concrete
2. Explain how aggregate impact value is
determined and its range
3. Explain the classification of mineral
admixtures
4. Discuss the structure of hydrated cement
Thursday, August 15, 2013
ASSIGNMENT – ESTIMATION & COSTING (LAST DATE - 22.08.2013)
1. Explain
the different methods of building estimates
2. Explain the following general items of work involved in the estimation
for a building along with the process of calculations.
(a) Earthwork in excavation.
(b) Earthwork in filling.
(c) Brick at soling.
(d) Cement concrete in foundation.
(e) Masonry work
(f) Damp proof course.
(g) White washing
(h) Painting
3. Prepare a detailed estimate
for earthwork for a portion of a road from the following data
Distance in m RL of ground RL of the formation
0 73.12
72.42
60 72.44
120 71.86
180 72.08
240 71.30 Downward
gradient 0.8% up to 240 m
300 70.80
360 70.54
420 70.82
480 70.96
540 71.50 Upward
gradient 0.5%
Proposed Formation width of road is 10m,
side slopes are 2:1 in banking and 1 1/2 :1 in cutting. Draw
L-section and cross sections.
4. Prepare Rate analysis for the following
items
(a) I-class Brick work in super structure with 20cm x 10cm x 10cm with
cement sand mortar 1:6
(b) Cement concrete 1:2:4 with Stone Ballast
5. Estimate the quantities of the following
items of a residential building from the drawing given below by Long wall Short
wall method
(i)
Earthwork in excavation in foundation
(ii)
Lime Concrete in foundation
(iii)
First class brickwork in cement sand mortar in foundation and plinth
(iv)
2.5cm damp proof course
(v)
First class brick work in lime mortar in super structure
Wednesday, August 14, 2013
Subscribe to:
Posts (Atom)






