Order of Documents in Project Report


Mahatma Gandhi Institute of Technology
Department of Civil Engineering
IV B.Tech Projects
The order of Documents to be placed in the Project Report
1.     Front page on Black background with Golden Colour Font.
2.     Blank White Paper.
3.     Print Front page on White paper (Repetition of 1).
4.     Transparent sheet (OHP Slide).
5.     Certificate
a.      On four copies to be submitted to the Office of CED, mention the names of all students in a batch with name followed by Roll No. in brackets.
b.     In candidates’ copy mention the respective name followed by Roll No. in brackets.
6.     Acknowledgements
7.     Abstract
8.     Contents
                        List of Figures

If you are numbering this section do the same with small Roman Numbers

                        List of Tables
                        List of Symbols
                        List of Annexure
Chapter 1  Introduction  (Start numbering pages of report with one here)
………….
………….
Chapter n
9.     List of Figures
10.                        List of Tables
11.                        List of Symbols
12.                        List of Annexure

The students are advised to follow the order mentioned above with out deviation.