Mahatma
Gandhi Institute of Technology
Department of Civil Engineering
IV B.Tech Projects
The order of Documents to be placed in the
Project Report
1.
Front page
on Black background with Golden Colour Font.
2.
Blank White Paper.
3.
Print Front
page on White paper (Repetition of 1).
4.
Transparent sheet
(OHP Slide).
5.
Certificate
a.
On four copies
to be submitted to the Office of CED, mention the names of all students in a
batch with name followed by Roll No. in brackets.
b.
In candidates’
copy mention the respective name followed by Roll No. in brackets.
6.
Acknowledgements
7.
Abstract
8.
Contents
List of Figures
|
If you are numbering this section do the
same with small Roman Numbers
|
List of Tables
|
|
List of Symbols
|
|
List of Annexure
|
Chapter 1 Introduction
(Start numbering pages of report with one here)
………….
………….
Chapter n
9.
List of
Figures
10.
List of
Tables
11.
List of Symbols
12.
List of Annexure
The students are advised to
follow the order mentioned above with out deviation.
Coordinator,
Projects HoD, CIVIL