It is informed that SHADAAN college is not going to provide IS CODE BOOK(IS 800:2007) and Steel tables.so students are requested to carry their own IS code and steel tables......please pass the information to all the students
Saturday, May 4, 2013
Friday, May 3, 2013
B.Tech I Year III Mid Marks
CIVIL ENGINEERING
ENGINEERING MECHANICS
Changes, if any, should brought to the notice of me by 10AM 6th May, 2013.
V.Venkat Ramayya, Asst. Professor, CED.
ENGINEERING MECHANICS
| Roll No | Des | Obj | Roll No | Des | Obj | Roll No | Des | Obj |
| 101 | 8 | 7 | 121 | 8 | 8 | 141 | 4 | 4 |
| 102 | 6 | 5 | 122 | 5 | 4 | 142 | 5 | 3 |
| 103 | 0 | 3 | 123 | 9 | 8 | 143 | 8 | 5 |
| 104 | 3 | 5 | 124 | 6 | 5 | 144 | 5 | 6 |
| 105 | 5 | 3 | 125 | 9 | 9 | 145 | 10 | 9 |
| 106 | 10 | 8 | 126 | 7 | 8 | 146 | 8 | 8 |
| 107 | 4 | 5 | 127 | 6 | 7 | 147 | 8 | 4 |
| 108 | 5 | 4 | 128 | 9 | 8 | 148 | 9 | 8 |
| 109 | 9 | 7 | 129 | 9 | 6 | 149 | 5 | 4 |
| 110 | 10 | 10 | 130 | 2 | 4 | 150 | 9 | 8 |
| 111 | 9 | 9 | 131 | 6 | 2 | 151 | 8 | 8 |
| 112 | 6 | 6 | 132 | 5 | 7 | 152 | 8 | 7 |
| 113 | 9 | 9 | 133 | 6 | 7 | 153 | 10 | 9 |
| 114 | 7 | 8 | 134 | 8 | 6 | 154 | 10 | 9 |
| 115 | 10 | 8 | 135 | 9 | 8 | 155 | 6 | 3 |
| 116 | 7 | 8 | 136 | 9 | 7 | 156 | 5 | 8 |
| 117 | 10 | 9 | 137 | 4 | 8 | 157 | 4 | 9 |
| 118 | A | A | 138 | 5 | 7 | 158 | 6 | 7 |
| 119 | 10 | 8 | 139 | 9 | 8 | 159 | 8 | 6 |
| 120 | 9 | 7 | 140 | 9 | 8 | 160 | 10 | 7 |
| 11-115 | A | A |
Changes, if any, should brought to the notice of me by 10AM 6th May, 2013.
V.Venkat Ramayya, Asst. Professor, CED.
Friday, April 26, 2013
ENGLISH LAB EXTERNAL PATTERN
English lab external pattern:
20 marks for written test- reading comprehension, paragraph writingother 30 marks for viva with the external, presentation or GD
Cover all the records with a brown or a transparent cover sheet.Attach the print outs of resume and cover letter to the record.Get vocabulary papers also
Sunday, April 21, 2013
GTE-II Marks
GTE II Marks
NOTE:
1. Roll No's 6, 14 and Le 8 are absent for both the tests.
2. Corrections if any should be brought to the Notice of me before 4PM 22/04/2013.
V.Venkat Ramayya, Asst. Prof, CED, MGIT.
| Roll No | Des | Obj | Roll No | Des | Obj | Roll No | Des | Obj |
| 125 | 9 | 6 | 149 | 8 | 3 | |||
| 102 | 10 | 4 | 126 | 10 | 4 | 150 | 9 | 3 |
| 103 | 9 | 4 | 127 | 9 | 5 | 151 | 9 | 4 |
| 104 | 8 | 3 | 128 | 10 | 5 | 152 | 8 | 4 |
| 105 | 8 | 3 | 129 | A | A | 153 | 10 | 6 |
| 106 | A | A | 130 | 10 | 3 | 154 | 8 | 4 |
| 107 | 8 | 3 | 131 | 7 | 3 | 155 | 8 | 3 |
| 108 | 9 | 5 | 132 | 9 | 4 | 156 | A | A |
| 109 | A | A | 133 | 10 | 4 | 157 | 9 | 4 |
| 110 | A | A | 134 | 9 | 4 | 158 | 8 | 4 |
| 111 | 9 | 5 | 135 | 9 | 3 | 159 | 9 | 3 |
| 112 | 10 | 4 | 136 | A | A | 160 | 9 | 3 |
| 113 | 10 | 4 | 137 | 9 | 5 | 101 | 9 | 5 |
| 114 | A | A | 138 | 10 | 5 | 102 | A | A |
| 115 | 10 | 4 | 139 | 10 | 3 | 103 | 8 | 4 |
| 116 | 8 | 5 | 140 | 8 | 2 | 104 | 8 | 4 |
| 117 | 9 | 3 | 141 | 9 | 3 | 105 | 9 | 4 |
| 118 | 7 | 3 | 142 | 9 | 3 | 106 | 10 | 7 |
| 119 | A | A | 143 | 9 | 3 | 107 | 10 | 6 |
| 120 | 8 | 3 | 144 | 8 | 6 | 108 | A | A |
| 121 | 8 | 4 | 145 | 9 | 7 | 109 | 8 | 5 |
| 122 | 10 | 4 | 146 | 8 | 6 | 110 | 10 | 4 |
| 123 | 10 | 4 | 147 | 8 | 2 | 111 | A | A |
| 124 | 5 | 5 | 148 | 8 | 1 | 112 | 9 | 6 |
NOTE:
1. Roll No's 6, 14 and Le 8 are absent for both the tests.
2. Corrections if any should be brought to the Notice of me before 4PM 22/04/2013.
V.Venkat Ramayya, Asst. Prof, CED, MGIT.
Sunday, April 7, 2013
GTE - II Assignment No. 2
MAHATMA GANDHI
INSTITUTE OF TECHNOLOGY
DEPARTMENT OF CIVIL
ENGINEERING
GEOTECHNICAL
ENGINEERING – II
Assignment – 2
Date of Issue: 8th
April, 2013
Last Date of
Submission: 15th April, 2013
Roll No’s: 10261A0102-136
1.
Explain
Terzhaghi’s Bearing Capacity Analysis to compute Ultimate Bearing Capacity for
General Shear Failure Conditions.
2.
Determine
the safe bearing capacity of rectangular footing 1mX2m founded at a depth of
saturated clay having a unit weight of 20kN/m3. The unconfined
compressive strength of the soil is 100kN/ m2. Use Skempton’s
Equation. Use a factor of safety as 2.5
3.
Describe
the forces acting on a well foundations.
4.
Explain
the following terms
(a)
Ultimate
bearing Capacity
(b)
Net
Ultimate bearing capacity
(c)
Gross
safe bearing capacity
5.
A
continuous footing of width 2m is to be placed at a depth of 1.5m below the
ground surface on a sandy clay soil. The properties of the soil are: c=20kN/m2,
ɸ=300 and γ=18kN/ m3. Calculate the ultimate bearing
capacity for the following cases.
i.
No
effect of water table.
ii.
Water
table at the base of the foundation.
iii.
Water
table at the Ground surface.
Take Nc =30, Nq =18
& Nγ=22
Roll No’s : 10261A0137-160
& 11265A0101-112
6.
Explain
the IS Code Method of finding the bearing capacity of the strip footing for
eccentrically loaded case.
7.
Explain
situations where PILE foundations are preferred and enumerate on classification
of PILE foundations.
8.
The
following results were obtained from a Plate load test conducted on a Sandy
Clay Stratum using a standard plate of 30cm square plate at a depth of 1.5m below ground level. Determine
the allowable load on a 1.8m square footing founded at same depth.
Pressure (kN/ m2) 25 50 100 200 300 400 500
Settlement (mm) 0.4 0.9 1.8 3.6 6.2 9.2 14.0
9.
Explain
the following terms
(a)
Allowable
bearing Pressure
(b)
Safe
bearing Pressure
(c)
Net
Safe bearing capacity
10. Explain the method of conducting
PILE load tests to determine the allowable load on piles.
-ooOoo-
CTPM ASSIGNMENT - 2nd Mid
LAST DATE OF SUBMISSION - 12-03-2013
1.Explain the common types of engineering
contracts and compare the following types of contracts
a.Item rate contract v/s lump-sum contract.
b.Cost plus contract v/s turnkey contract.
2.For the data given in the table perform resource leveling within
the minimum project duration for the smaller number of workers if the
activities cannot be split.
|
Activities
|
Duration(days)
|
No of
workers
|
|
(1,2)
|
8
|
4
|
|
(1,3)
|
7
|
10
|
|
(1,5)
|
12
|
5
|
|
(2,3)
|
4
|
6
|
|
(2,4)
|
10
|
7
|
|
(3,4)
|
3
|
5
|
|
(3,5)
|
5
|
8
|
|
(3,6)
|
10
|
7
|
|
(4,6)
|
7
|
11
|
|
(5,6)
|
4
|
3
|
3.A construction company engaged in undertaking small projects has
recently been
awarded a project .The project activities and the estimated time for
their completion are
listed below along with the information on immediate predecessors.
a.Construct a network for the project.
b.Determine the critical path
and the project completion time.
c.Determine the time interval within which the probability of
completion of the project
will be 90%.
|
Activity
|
Days
|
Immediate predecessor
|
||
|
t0
|
tm
|
tp
|
||
|
A
|
8
|
10
|
12
|
-
|
|
B
|
6
|
7
|
9
|
-
|
|
C
|
3
|
3
|
4
|
-
|
|
D
|
10
|
20
|
30
|
A
|
|
E
|
6
|
7
|
8
|
C
|
|
F
|
9
|
10
|
11
|
B,D,E
|
|
G
|
6
|
7
|
10
|
B,D,E
|
|
H
|
14
|
15
|
16
|
F
|
|
I
|
10
|
11
|
13
|
F
|
|
J
|
6
|
7
|
8
|
G,H
|
|
K
|
4
|
7
|
8
|
I,H
|
|
L
|
1
|
2
|
4
|
G,H
|
Subscribe to: