ESTIMATION & COSTING ASSIGNMENT
LAST DATE FOR SUBMISSION - 21-10-2013
1. Explain the following methods along with an example.
(a) Sinking fund Method
(b) Straight Line Method
(c) Declining Balance Method
(d) Years Purchase Method
2. (a) List and explain general specifications of a first class building.
(b) Explain the detailed specifications for Lime Concrete in Foundation
3. Explain the following clauses used in conditions of contract.
(a) Security deposit.
(b) Supply of Water
(c) Retention money
4. The below Figure shows longitudinal and cross sections at mid span and support of R.C. T - beam 22 cm by 40 cm over all including the slab thickness 10 cm. The beam of which particulars are shown in the figure is continuous over two equal spans 4 m clear and supported on 30 cm walls. Prepare the details of bars for the beam, giving a bar bending schedule and total weight of steel required. Assume other data