Assignment – II
Date of Issue: 21st March, 2012
Last Date for Submission: 4th April, 2012

1.    Distinguish between the English and Flemish Bonds in brick masonry.
2.    Write a note on Ashlar Masonry.
3.    Explain the following terms in the stone masonry.

                                      I.        Perpend
                                    II.        Queen Closer 
                                   III.        Bat
                                  IV.        Quion

                                    V.        Mitred Closer
                                  VI.        Through Stone
                                 VII.        Buttress                      
                                VIII.        Lap


4.    What are the requirements of good plaster?
5.    What is scaffolding? Enumerate on different types of scaffolding.
6.    Explain the process of shoring. What are the types of shoring?
7.    What are the requirements of ventilation system? Enumerate on different types of providing ventilation.
8.    Write a short note on Accoustic Defects.
9.    What are the factors to be considered in acoustic design of buildings?
10.  Enumerate on fire safety requirements of buildings.
11.  Write a note on Classification of Buildings.
12.  What are the factors to be considered in the Planning of Buildings.
13.  Write a note on Building Bye-laws.
14.  Write a note on the following
                                      I.        Lux Levels
                                    II.        Constituents of a Paint
                                   III.        Underpinning
                                  IV.        Fire Load
                                    V.        Air changes per hour




   